Ground Fault Prevention Demonstration, w/ VSGR – March 2019 dates are available

Arch Flash Prevention with VSGR

Contact me to setup a demonstration at your office, allow 1.5hr

Demonstration includes:

1. 3ph Electrical Load with PQ analyzer view: Volts/ph, Amps/ph, Volts ph/ph, Phasors, etc.

2. Phaseback VSGR with manual disconnect.

3. Fault simulator with disconnect.

See charts above, which show actual information from such a demonstration.

Outline of subjects discussed

  • Prevent Arc Flash, by preventing the Arcing ground fault from developing.
  • Balance voltage, phase to ground continuously, is the key.
  • Surge removal – eliminate Transients, KEMA Arc Flash test discussed.
  • PHASE ANGLE DISPLACEMENT CORRECTION demonstrated.
  • Electrical Noise, and their negative effects, removal.
  • Current Harmonics removal.
  • ENERGY EFFICIENCY IMPROVEMENT, discussion.
  • Alarm and Trip functions, discussion.
  • Keep Voltage Harmonics within IEEE519 limits, discussion.
  • Electrical system expectations with VSGR, and more.
logo-supertran-icon

Talk to Our Experts

"*" indicates required fields

This field is for validation purposes and should be left unchanged.